000 | 00619nam a22001937a 4500 | ||
---|---|---|---|
001 | ched48490813 | ||
005 | 20240425162641.0 | ||
008 | 110705t xxu||||| |||| 00| 0 eng d | ||
050 | _aCD-00875t | ||
099 |
_c2440 _d2440 |
||
100 | _aSio, Dhesirey Beryl Ko | ||
245 |
_aModeling the impact of kanban design to cycle time, through put and WIP in a high volume manufacturing system _cDhesirey Beryl Ko Sio |
||
260 |
_aManila _bDe La Salle University _c2009. |
||
300 | _a122p. | ||
502 |
_bMaster of Science _aIndustrial Engineering |
||
630 | _aIndustrial engineering | ||
942 | _cTD | ||
999 |
_c2138 _d2138 |